PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing duct work at the 4th floor Facing East.jpg Installing duct work at the 4th Floor Facing South.jpg Roof Insulation material Facing South (2).jpg Roof Insulation material Facing South.jpg Roof Insulation material Facing West.jpg Started installing sprinkler main raiser at the 4th floor Faacing North.jpg Welding Monumental Stair treads Facing East.jpg
Previous pageNext page Roof Insulation material Facing West
Roof Insulation material Facing West